DBE Projects/Opportunities

Everett Station PM Parking Lots

Subcontractor Walk Through:
Date: Tuesday, September 3, 2019
Time: 1 p.m.
Locations : Everett Station
3201 Smith Ave., 98201

Contact:
Lori Nocholson, Forma Construction, Project Manager
E: LoriN@formacc.com,
P: 206.475.0792

Invitation to bid on the following project for FORMA Construction- JC19193 Everett Station PM Parking Lots

Project Description: Seal and stripe parking lots at Everett Station. Work includes approximately 635 parking stalls located in the N, NW, W and S parking lots and will be completed using WSDOT best practices and standards. ADA being added in the West lot will be compliant with federal requirements and work to be completed in phases, with temporary ADA parking stalls added, to minimize impact to those using Everett Station. The path of travel for disabled individuals will remain accessible. Striping stalls for designated usage will be indicated on parking plan and curbing in parking lots, bus bay and loading zones to be painted to match existing. Striping and curb painting will require the use of red, yellow, blue and white paint. Removal and replacement of thermoplastic directional arrows in bus bay, parking lots and 2-hour parking stalls will be indicated on parking plan. Application of crack sealer, and removal and replacement of damaged asphalt in areas of excessive wear will be determined upon site visit.

The subcontractor walk has been schedule for Tuesday, 9/3/2019 at 1 :00 P.M. (3201 Smith Ave, Everett, WA 98201)

Everett Station Exterior Lighting Project